| | Copper pipe fittings via crimping tool, without torch |
| | Layer of coarse gravel provides capillary break between ground and slab |
| | Post tension cable system for expansive soil conditions – to limit width of any slab cracks (Post Tension Slabs) |
| | | Termite soil treatment (Termidor) – first line of termite protection |
| | Durable moisture barrier (Vapor Block 6 by Raven) under slab and grade beams to prevent wicking ground moisture |
| | Spraying second termite treatment on teaching center |
|